金沙集团网址-[登录官网]

Sudan Dueim Bridge Achieves Bridge Construction Excellence
  Date:2011-05-25  Visits:

After Sudan Ruffa Bridge Project, Sudan Dueim Bridge Project also achieved Bridge Construction Excellence issued by National Highway Authority inon May 24th. This bridge passed the acceptance check on May 21st.

is located aboutsouth of, just on the. The Bridge islong andwide. Total cost is US$ 35,800,000. The project period is 30 months.

This project is jointly undertaken by POLY TECHNOLOGIES, INC and our Group. It is also the second modern bridge project we undertook in.

 

登录官网

 

Produced By 金沙集团网址-[登录官网]
XML 地图 | Sitemap 地图